Abstract:According to demand of 4 000 kW synchronous motor for the extension project of drain flooded fields in Nanchang proper.We propose an exciter and computer monitor-control scheme on basis of the technical development.This scheme will improve the reliability
万彬. 青山湖排涝扩建工程励磁和微机监控系统[J]. 南昌大学学报(工科版), 1999, 21(04): 1-.
Wan Bin (Power Drain Flooded Station of Qingshan Lake of Nanchang City,Nanchang 330008). . , 1999, 21(04): 1-.